February 03, 2021

Mouse Droid for 2021.......GOUD-4 version [Solo]

GOUD-4 Mouse droid

This project has been sat on my shelf since 2019!
Decided that this needs doing. But rather than it get lost like some of my other projects, I’ve decided to create its own Blog.

Update coming soon with link :)

June 07, 2019

New project.......Schumacher SST chassis - MSE Mouse Droid...?

Continuing on from this post.........

So a few week’s back, I spent some lunchtimes, cleaning the chassis of this RC.
I started to strip the car down piece by piece to service the broken/damaged parts. Namely the rear differential and the belt(s). One of them being broken. A stone had got trapped between the belt and the gears and chewed up both, breaking the belt itself.
Schumacher SST Sport, Schumacher SST '99 Pro chassis
The chassis was, I thought, a Schumacher SST Sport, did a bit of research to find out that it was in fact a Schumacher SST '99 Pro!
Thankfully the replacement parts I needed & have bought were the same!

Schumacher SST Sport chassis, Schumacher SST '99 Pro

Schumacher SST chassis

Schumacher SST 99 Pro chassis

Schumacher SST 99 Pro chassis

Schumacher SST Sport chassis
I gave everything a watch down with an old toothbrush to get rid of all the dirt & dust.
Schumacher SST 99 pro
 This is the damaged differential and needed to be replaced.
Schumacher SST
 This is the good one, it just needed to be stripped down and cleaned up, old dried grease to be removed & then re-oiled and re-assembled.
Schumacher SST
I found the belts, main gear and new differential online & on eBay.

Schumacher SST 99 Pro chassis
 All (mostly) cleaned up and re-assembled.
Schumacher SST 99 Pro
Here's the new differential fitting back into place.

Next:
  • Wheels & tyres
  • power & controller check
  • probably a lot of other things I'll find on the way lol.

May 24, 2019

Another project.....?

A friend from work gave me this a few years back, (thanks Steve), but didn’t have time to work on it. I still don’t have much free time lol, but just enough to make a start on it so that by the time it’s cleaned up I'll have decided what I'm going to build.

I did find a stone wedged between the gear and the belt, which explained why the teeth are a mess and the belt ultimatly broke.

Good news is that I have now tracked down the information needed to repaire the broken parts and move this projecct forward.

October 16, 2017

New Dome - 3D printing parts - holo projector eye

Downloaded the stl files from the Builders section, www.astromech.net, and asked Steve, my co worker (who has the 3D printer program), to start printing off a holo projector eye.

Parts 1 & 2, upper and lower cowl pieces were done in a few hours, but had to wait till the next day for the main piece to be finished printed.

Pics bottom, with support raft in first picture, second shows support raft removed.

Next up was the upper cowl part.
This didn't take long to print at all. So my Steve was able to start printing the main body.
All are in the process of being sanded, filed and generally smoothed as best possible, before I'll start primer/filler spraying them up.

Next up was to source a cabochon for the lens......3D print one perhaps?

But my friend Glynn saw my Instagram post and has offered me some, they're now in the post to me, thanks mate, much appreciated!

April 27, 2017

R5's dome rotation upgrade 1.7 - metal ring

I needed to add some more pads & had Steve add some more tabs to help centralize the metal band. I was considering weight against thickness, but the thicker metal may have been a better choice in helping to reduce flex of the band. The additional pads and tabs should hopefully help with this. Found that these were not actually needed.

Next up was preparing the ring for painting. I'd already lightly sanded the ring and edges to key the surface and deburr the edges. I then used pin stripe tap to line edge & mask off for spraying up.

Using the original skin, I'd measured up about 25mm.

I then wrapped around the pin stripe tape and then masking tape.

~~~

Now Easter break is over, I was able to get back on with sorting out the new neck ring. It's not been easy, lol, with the dome in work sorting neck ring and clearance with the new bearing. Then taking the bearing and un-attached neck home, to check it all works on the body with the motor etc.

Well....... due to my unique skills, lol, the ring needed to be re-worked a bit. Then it was time to screw it all back onto R5's dome.

Glass fiber filler the gap between the metal ring and the wood. This was applied via the inside to also give some extra strength to the wood angled piece.

Wood filler applied:

This was then sanded smooth once dried. This side needed a bit more than the other.

Next up was primer. So I bagged up the dome and masking taped it off at the edge.
Using works spray booth makes life easier and breathable lol.
R5-D4

Due to time, I didn't take any pics of spraying up white, but it was the same as the grey pic lol. This work was done yesterday and left over night, to stink out works workshop.

This mornings little project was applying the neck's silver tape. Now, you can/could use silver spray paint, but this tape matches the other tape used on other parts of R5. Plus it re-matches the original he previously had.
R5D4
Goes on easy'ish, then used a cloth to smooth out all the edges & wrinkles. Next up was to trim off the excess.
Once I'd finished this, it was back into the spray booth to clear coat the new paint and silver tape.
Then once it was dry, it was de-bag time.
R5-D4
The white, is WHITE lol, so will need to be dirtied up a bit before Saturday's Lego Land event! It's amazing to see the colour difference over the time since I'd originally sprayed up R5's dome. Hopefully this should last him a few more years.

April 11, 2017

R5's dome rotation upgrade 1.6 - metal ring

My co-worker Steve, who's just a little bit handy with welding, said he'd be able to roll and weld up the new lower dome ring. So I drew up some sketches and talked through what would be needed. He then took the metal strip home over the weekend and got to cutting and welding.

this supplier has materials & options available to be cut to your own required sizes.

The cut material didn't need much deburring, only along one edge. This option is available on contacting the company. Steve welded on four 'tabs' that would be drilled and countersunk/t-nut's fitted to the wood part of the ring. The ring then screwed back in place onto the dome itself.

Welded ring with location tabs
Welded ring with location tabs
This just shows the fit and tab position. The bearing isn't shown, hence the tab to wood gap.

Next was to mark and drill fixing holes in the tabs.


Next was to then press fit in the t-nuts and screw in the counter sunk bolts.

And of course, the test fit on the dome (held in place for photo)
The gap was needed as wanted to ensure correct fit, and wood being wood, it's not perfect lol. The gap fill be filled with fiberglass & resin, then smoothed off with filler.

This metal ring add's strength to the lower neck.