October 17, 2024

OpenR2 - original ‘77: R5-D4 Blueprints - 3D drawn up (Part 2)

 May 29th 2023: this was going to be the next stage, not completed.

Sanding, primer and silver paint.

I drew up a location plug that would fit inside the rear of the eye and match the original hole locations in the dome.

Once the rear had been sanded to the curvature of the dome for a snug fit, I refitted the cabochon lens and the retaining ring.

No comments:

Post a Comment