November 27, 2012

Main Leg 2 - 2.3

T-nuts are now in place so I test fitted the leg studding through the body, shoulder discs & into the Leg. Thightened up the internal nuts, pulling the studding tight onto the T-Nuts [fitted inside the leg]. Once happy, I fitted all the screws in place, clamping the leg sections together. Next I attached the rear & front ankle plates, that thicken up the ankle. Before I went any further, I opened out the hole in the Leg to accept the Shoulder Hub, as I'd forgot to do this the other day, lol. I then added aluminium strips as guides to the side edge of leg & started to apply wood filler. Also applied to the ankle side edge & edge of shoulder radius. Once dried I started to file flat any high spots.

No comments:

Post a Comment