This has been something that has bugged me for a while now. Transporting R5 in his 3 leg mode is not easy.
First was the new leg transport board.
This worked and R5 etc could be loaded up into my small car. But the legs then took up a lot of space (height wise) so making packing the dome(s) etc in, a tight squeeze.
I have been envious of droids that could be pivoted from 3 leg mode into 2 leg since i first made R5. If i had known then what i know now lol.
So after last weekend’s Builders meet, I decided it was time to upgrade……again.
I wasn’t able to use opposite bolt locations (4 off) due to my top plate bracket. So had to go with the four consecutive bolt holes.
This is fine as i can use the remaining hole as a locking one. The washers and wing nuts are temporary whilst the other side was worked on.
I’ve got some larger washers and nylock nuts coming.
Next will be designing a new transport sledge.
No comments:
Post a Comment