April 16, 2015

Sound board - installation complete 1.1

Made up some wood location stands, cut slot's into them and screwed them to some MDF base plates. These were then screwed into place.

I then made up a cardboard template of the metal bracket I wanted to make to secure the top of the board. Cut, drilled and then bent into shape, marked position on board and drilled a clearance hole for a bolt, washers, spring washer and a butterfly nut, to secure in place.

I then finished off some more wire's, soldering and connected these back up to there respective terminal blocks.
R5-D4,

R5-D4

R5-D4 sound system
The top securing bracket can be seen better in this image.
This lot took over an hour to complete!

No comments:

Post a Comment