Got round to bending, cutting and drilling the last piece of angle
bracket. Marked and drilled upper mesh location holes. Screwed them back into place.
Droid Builder
Extra Projects & Event Page's
- Home
- Trading Card Dispenser (NEW version 3) - TCD [2020/2022]
- Trading Cards
- R5-D4's ....Bad Motivator development
- R5-D4 - silver neck details
- R4-D4 - Dome [wood build]
- R0-D4 Dome [wood build]
- 3D Printing
- *** Star Wars Shoes ***
- GOUD-4 Messenger Droid - Solo ASWS
- Event: Mshed Bristol 2025
- Event: Mshed Bristol 2024
- Event's 2018
- Event's 2017
- Event 2016 - "Celebration Europe"
- Event's 2015
- Event 2014 - Chippenham Sci-Fi
- R5-D4 - events page - The beginning (2013)
- ** R5-D4 patch **
- R5-D4 Photos
- Costume for my Son - Han Solo -
- Costume for my Son - Boba Fett
- Droid Caller - Han Solo style
- Scanning Crew Container - Transmitter Storage Box
- Stormtrooper - me
- Rogue One - trading card storage box
- Rogue One
- Jabba’s gate prop for Celebration 2023
- Treadwell Droid - WED-15-77
Showing posts with label R5's Lower Vent. Show all posts
Showing posts with label R5's Lower Vent. Show all posts
February 17, 2014
February 13, 2014
July 09, 2011
Lower Vent Surround cardboard test internals
Lower vent, cardboard internals mock-up.
Made this up to check the fit for my custom made vent surrounds.
Have started on the metal version. Post pics soon.
Made this up to check the fit for my custom made vent surrounds.
Have started on the metal version. Post pics soon.
July 05, 2011
Lower Front Vent Surround:
Finished off machine milling the lower Vent Surround. Internal & external shaped, angle on back face done. Edges removed, polished up a bit. Next, internals to build.
June 24, 2011
Lower Vent Surround
The works milling machine is now set up & 'free' again. So drilled out centre part. Then milled angle onto back face.
I need to counter sink the two screw holes more to make the back flush across.
Had two minutes to spare so polished up the surrounds outside visable edges.
Next, is to mill out the internal to size.
I need to counter sink the two screw holes more to make the back flush across.
Had two minutes to spare so polished up the surrounds outside visable edges.
Next, is to mill out the internal to size.
June 16, 2011
A busy week
I'v been busy this last week machining the lower front vent surround. Milled it to it's outside dimensions.
Just need to drill & mill out the internal part, then mill the 4 Degree angle on the back face.
Unfortunatly the Milling machine was then out of action for a day or so not wanting to waste any time, started machining up a Restraining Bolt on the lathe.
Then, after finding the part-off tool, parted off and tap an M10 thread in the rear face.
Also this week I've been filling and sanding plugs and other holes in R5's base (where I had had to cut all the way through it), and also covering screw heads.
Have also marked up some templates, for building the centre leg.
Just need to drill & mill out the internal part, then mill the 4 Degree angle on the back face.
Unfortunatly the Milling machine was then out of action for a day or so not wanting to waste any time, started machining up a Restraining Bolt on the lathe.
Then, after finding the part-off tool, parted off and tap an M10 thread in the rear face.
Also this week I've been filling and sanding plugs and other holes in R5's base (where I had had to cut all the way through it), and also covering screw heads.
Have also marked up some templates, for building the centre leg.
Subscribe to:
Posts (Atom)