July 08, 2014

Outer Foot No2 - New foot internal frame work 1.1

Marked up and drilled holes for motor bolts and the large hole for the motor to fit through, see below.
R5D4 motorised foot drive

Cut up two scrap pieces which will be welded across the to side plates.
R5's motorised foot drive
Fitted a location bolt to aid welder later on. Did some more work on the two channel wall pieces. Drilled the main bolt location holes and have started on the angles to support the sides for welding up.

No comments:

Post a Comment