May 26, 2017

Centre Leg - Film version **UPDATE - 1.2 - centre foot shell**

With all the other work going on, the part that would need some real thought was the new side foot shell panels.

The original ones I made, were screwed onto the main shell, so these new ones will be too.
Centre foot shell with side panel removed.
Semi-circle at top of opening
is there to help remove the centre leg securing bolt.

First panel cut out, next was to apply watered down PVA glue.
This helps seal the wood for spraying, strengthens it as well.
Once done and dried, a light sanding of the edges & faces was carried out.

I marked out the second panel,

And then primer sprayed up the lot.

Next will be to spray up the lot in white.

No comments:

Post a Comment