April 04, 2017

R5's transport sledge 'upgrade work' pt4

With the new dome lazy susan bearing soon to be permanently fitted in place, the sledge will also need an upgrade.
In order for the lower part of the sledge to be able to lift up R5, the top struts (seen in the above picture) need to be trimmed to accommodate the extra 10mm or so of the new bearing. So I marked up and then jigsawed off the extra material. These have insulation foam on as can be seen in the lower right part of the picture, to protect him in transport.

Due to the position of the dome location bolts, the length of the struts needed to be shortened as well.
Bottom strut has a pencil line for where to cut to length. The upper strut in the above pic had already been cut to new shorter length. The foam was then re-attached to the struts as well as the cross beam strengthening piece.

No comments:

Post a Comment