Two parts screwed together. |
Extra Projects & Event Page's
- Home
- Trading Card Dispenser (version 2) - TCD [2020/2022]
- R5-D4 - Trading Cards
- My R5-D4's ....Bad Motivator development
- R5-D4 - silver neck details
- R4-D4 - Dome [wood build]
- R0-D4 Dome [wood build]
- 3D Printing - Star Wars stuff
- *** Star Wars Shoes ***
- GOUD-4 Messenger Droid - Solo ASWS
- Event: Mshed Bristol 2024
- Event's 2018
- Event's 2017
- Event 2016 - "Celebration Europe"
- Event's 2015
- Event 2014 - Chippenham Sci-Fi
- R5-D4 - events page - The beginning (2013)
- ** R5-D4 patch **
- R5-D4 Photos
- Han Solo - costume for my Son
- Droid Caller - Han Solo style
- Boba Fett - costume build for my Son
- Scanning Crew Container - Transmitter Storage Box
- Stormtrooper - me
- ROGUE ONE - trading card storage box
- Rogue One
- Jabba’s gate prop for Celebration 2023
- Treadwell Droid - WED-15-77
May 10, 2011
Front Vents...... update pt3
Got a little bit more done today on the first top vent. First thing this morning I drilled out the rear part of the vent surround. Then on my lunch break I drilled, counter-sunk & thread tapped the two parts together. This is so that when it comes to milling the inside and outside, both pieces will be 'paired'.
Hopefully tomorrow I'll be able to machine out the insides.
Labels:
Front Vent
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment