James' R5-D4
.....(formerly My R5-D4 ASTROMECH DROID)
Extra Projects & Event Page's
(Move to ...)
Home
Event: Droids @Mshed Bristol 2026
Event: Droids @Mshed Bristol 2025
Event: Droids @Mshed Bristol 2024
Trading Card Dispenser (version 2) - TCD [2020/2022]
Trading Cards
R5-D4's ....Bad Motivator development
R5-D4 - silver neck details
R4-D4 - Dome [wood build]
R0-D4 Dome [wood build]
3D Printing - Star Wars stuff
*** Star Wars Shoes ***
Event's 2018
Event's 2017
Celebration Europe 2016
Celebration Europe 2023
Event's 2015
Event 2014 - Chippenham Sci-Fi
R5-D4 - events page - The beginning (2013)
** R5-D4 patch **
R5-D4 Photos
Costume for my Son - Han Solo -
Costume for my Son - Boba Fett
Droid Caller - Han Solo style
Scanning Crew Container - Transmitter Storage Box
Stormtrooper - me
Rogue One - trading card storage box
Rogue One
GOUD-4 Messenger Droid - Solo ASWS
Jabba’s gate prop for Celebration 2023
Treadwell Droid - WED-15-77
▼
Showing posts with label
Cylinder Wedge
.
Show all posts
Showing posts with label
Cylinder Wedge
.
Show all posts
May 25, 2017
Centre Leg - Film version **UPDATE - 1.1 - ankle details**
›
I already had the plans for the ankle details, which are available via www.astromech.net forum, so it was just a case of marking up some wo...
Centre Leg - Film version **UPDATE - 1.0 - ankle cylinder**
›
A long time ago.......... ;-) I realised that my nagging conscious wasn't going to let me sleep anymore lol. This (zoomed in) image o...
March 13, 2014
Leg Assembly......again
›
Last night I got to re-assembly Leg No1 again. The way most of these components were designed to be connected together was not my '...
March 12, 2014
Horseshoe No2 - Hydraulic & Buttons fitted
›
To make space in the bedroom [keeping the wife happy] I took the Horseshoe back out to the garage and fitted [bolted] the Hydraulic & t...
January 07, 2013
Ankle Cylinder for Main Leg No.2 - 2.2
›
I've eventually got round to taking some photos, don't really like to post without them, as it's a bit boring and a picture mak...
December 15, 2012
Main Leg 2 - 2.4 - Ankle work [bracelet & wedge]
›
Ankle I marked out the curve section needed on the two blocks I'll be using to make up the ankle. I also marked where I need to drill c...
September 09, 2012
Leg 1 update
›
Clear sprayed Leg No1 up, don't know or remember why I'd not done it before now, apart from the Horse shoe, it's completed ??? ...
November 29, 2011
Main Leg 1.4, Ankle Wedge 1.4 Centre Leg build update
›
Spent 2.5hrs working on leg. Sanding then more wood filler. Made the counter sunk holes bigger on five of the screw holes. Then filled wi...
November 21, 2011
Ankle Wedge build 1.2
›
The template i had made was the right size, but the trimmed wood ones came out a bit small. The filler needed filing down and the gap left ...
October 05, 2011
Spraying up stuff
›
Well, it wouldn't last long before I HAD to do some work on R5 :-D Bought some white and clear spray paint the other weekend, well I w...
September 12, 2011
Cylinder wedges
›
I also measured up & cut out a piece of thin hardboard to be the face of the cylinder wedge. Not sure how to secure bracket yet but do h...
›
Home
View web version