Extra Projects & Event Page's

July 02, 2014

Outer Feet - New foot internal frame work 1.7

Test fitted the 'new' foot build on the leg. All fits well and looks good.
Just need to fit front caster.
Outer Foot No1 - motor installed

Outer Foot No1 - motor installed

Fitting the front caster.
I marked up some aluminium angle and drilled 5mm dia clearance holes in it. I then tapped out two holes to M5 threads and secured the angle in place.
Front Caster fitting

Front Caster fitting

I didn't have to but thought it would make life easier to remove the excess metal from the
side plates, below the angle. I also have some M5 hex socket head bolts/screws
on order, as my 'supply' has now run dry ;D

No comments:

Post a Comment