the squaqe top part of R5's leg strut. I used the lathe to turn the top diameter and undercut (groove). Then used the Milling machine to mill the four flats and drill the connecting angled hole.
Finished
After machining the top section to correct length, first leg strut complete. Next, strut no.2.
No comments:
Post a Comment