James' R5-D4
.....(formerly My R5-D4 ASTROMECH DROID)
Extra Projects & Event Page's
(Move to ...)
Home
Event: Droids @Mshed Bristol 2026
Event: Droids @Mshed Bristol 2025
Event: Droids @Mshed Bristol 2024
Trading Card Dispenser (version 2) - TCD [2020/2022]
Trading Cards
R5-D4's ....Bad Motivator development
R5-D4 - silver neck details
R4-D4 - Dome [wood build]
R0-D4 Dome [wood build]
3D Printing - Star Wars stuff
*** Star Wars Shoes ***
Event's 2018
Event's 2017
Celebration Europe 2016
Celebration Europe 2023
Event's 2015
Event 2014 - Chippenham Sci-Fi
R5-D4 - events page - The beginning (2013)
** R5-D4 patch **
R5-D4 Photos
Costume for my Son - Han Solo -
Costume for my Son - Boba Fett
Droid Caller - Han Solo style
Scanning Crew Container - Transmitter Storage Box
Stormtrooper - me
Rogue One - trading card storage box
Rogue One
GOUD-4 Messenger Droid - Solo ASWS
Jabba’s gate prop for Celebration 2023
Treadwell Droid - WED-15-77
▼
Showing posts with label
R5's Body - Base
.
Show all posts
Showing posts with label
R5's Body - Base
.
Show all posts
January 23, 2017
Centre Leg - securing bracket upgrade
›
The centre leg securing bracket needed upgrading. Original pieces were two aluminium angles that clamped either side of the leg tongue,...
1 comment:
May 10, 2012
R5-D4's Body Skin 1.6 [Power Coupler 1.3]
›
Cut out a recess in the base to accept the power coupler. Not the most tidy'est of work, but it works lol. Did some more spraying:...
May 04, 2012
R5-D4's Body Skin 1.5, [Power Coupler's 1.1]
›
Started to cut out the five vertical slots in the lower front recessed vent. Two now done. Again, it was late, so used a Stanley knife to sc...
April 16, 2012
R5-D4 Body Skin 1.2
›
Filed the extra extensions to which the lower side flats will be fixed too. These were made when I originally built the frame, and were a li...
March 09, 2012
Base - blanking 1.2
›
Base insert. Cut out & filed it to fit in the gap. I used a simple cardboard template. Now glued into place. Just needs some extra...
February 14, 2012
Base - blanking 1.1
›
Prepared and applied several coats of grey primer to the two blanks I had to fit to the base. See post:- 'Base - blanking 1.0' ...
December 23, 2011
Base - blanking 1.0
›
Filled another one of the gaps in base with a blanking plate [wood] and P40. This cut out was done when the base was made as I didn...
July 24, 2011
Work so far.... Shoulder Hydraulic and Centre Leg work
›
Friday in work: I milled flat the rear of the shoulder hydraulic unit. Also drilled two location holes, for fixing it with dowels into the s...
April 05, 2011
Base Plate
›
Saturday I cut out slots for the Power coupler and Octagon Ports. This is because the depth was the same as the base and wasn't possible...
March 18, 2011
Base marking progress
›
Rechecked angles and other dimensions.
March 17, 2011
Base marking has begun
›
Got home from work last night and managed to get started on marking up the base plate for R5. I'll be able to 'cut wood' at the ...
›
Home
View web version