James' R5-D4
.....(formerly My R5-D4 ASTROMECH DROID)
Extra Projects & Event Page's
(Move to ...)
Home
Event: Droids @Mshed Bristol 2026
Event: Droids @Mshed Bristol 2025
Event: Droids @Mshed Bristol 2024
Trading Card Dispenser (version 2) - TCD [2020/2022]
Trading Cards
R5-D4's ....Bad Motivator development
R5-D4 - silver neck details
R4-D4 - Dome [wood build]
R0-D4 Dome [wood build]
3D Printing - Star Wars stuff
*** Star Wars Shoes ***
Event's 2018
Event's 2017
Celebration Europe 2016
Celebration Europe 2023
Event's 2015
Event 2014 - Chippenham Sci-Fi
R5-D4 - events page - The beginning (2013)
** R5-D4 patch **
R5-D4 Photos
Costume for my Son - Han Solo -
Costume for my Son - Boba Fett
Droid Caller - Han Solo style
Scanning Crew Container - Transmitter Storage Box
Stormtrooper - me
Rogue One - trading card storage box
Rogue One
GOUD-4 Messenger Droid - Solo ASWS
Jabba’s gate prop for Celebration 2023
Treadwell Droid - WED-15-77
▼
Showing posts with label
Ankle Cylinder Holder
.
Show all posts
Showing posts with label
Ankle Cylinder Holder
.
Show all posts
June 05, 2017
Centre Leg - Film version **UPDATE 1.4**
›
So i got home from work Friday 26th and gave the components a lite sanding over the primer paint. I then set up my hi tech spray booth.......
June 11, 2015
New Centre Leg - 1.7 - Installation
›
So last night I started to re-assemble all the components for R5's new centre leg. First off was fitting the internal wheel platform ...
June 10, 2015
New Centre Leg - 1.6 - White paint & Dirt
›
So here's the new centre leg all sprayed up in white with clear coat too. Ankle cylinder unit and holder fitted in place too. I did ...
June 09, 2015
New Centre Leg - 1.5 - Primer & Bush
›
After some more sanding of filler. I next cut up a piece of 8mm dia dowell. This was instead of the planned two screws to hold on the cylin...
June 08, 2015
New Centre Leg - 1.4 - Cylinder work
›
So Friday night's I managed 2 hrs work, re-drilled cylinder location fixing holes. Happier with position now. Played with position of ne...
June 05, 2015
New Centre Leg - 1.3 - Ankle Cylinder
›
As only one or the other centre leg will ever be used at one time, I'm going to swap over one of the ankle cylinders to the new Centre ...
April 22, 2014
Weathering 1.3 - Body, Leg, Outer Foot and Battery Box
›
My attempt at weathing R5's body. Started next to the fitted rear hatch and worked my way round. The Leg got in the way so moved onto t...
March 12, 2014
Horseshoe No2 - Hydraulic & Buttons fitted
›
To make space in the bedroom [keeping the wife happy] I took the Horseshoe back out to the garage and fitted [bolted] the Hydraulic & t...
January 07, 2013
Ankle Cylinder for Main Leg No.2 - 2.2
›
I've eventually got round to taking some photos, don't really like to post without them, as it's a bit boring and a picture mak...
December 15, 2012
Main Leg 2 - 2.4 - Ankle work [bracelet & wedge]
›
Ankle I marked out the curve section needed on the two blocks I'll be using to make up the ankle. I also marked where I need to drill c...
September 09, 2012
Leg 1 update
›
Clear sprayed Leg No1 up, don't know or remember why I'd not done it before now, apart from the Horse shoe, it's completed ??? ...
January 03, 2012
Ankle Cylinder / Wedge No3 - 1.3 - paint
›
Sanded the wood filler smooth, then sprayed primer all over. Masked off into sections and then sprayed silver. Once dried, re-mask...
December 21, 2011
Ankle Cylinder Holder 1.4 - paint
›
Cylinder holder sprayed white. Just needs clear spray paint and attaching to the Ankle Cylinder.
December 16, 2011
Ankle Cylinder Holder 1.3
›
Applied more wood filler to cylinder holders bottom edge, to cover the wood grain and to make smoother. Once dried, it was sanded. Requ...
December 15, 2011
Leg Assembly 1.7, Ankle Cylinder fitting
›
Ankle Cylinder fixings. 10mm dia drill bit, clearance for dowel 9mm dia. (bought original to make the under shoulder stabilisers) ...
›
Home
View web version